An AI agent for construction site diaries can organise photos and notes by area, then compare the drawing revision mentioned in the field with the approved revision in the project register. It produces an issue the responsible person can check against the records. A first test only needs one area, one drawing and three fictional revisions with different statuses.
- Note
Record the area, time of the observation and drawing the crew consulted.
- Register
Find the approved revision that applied at the time of the note.
- Review
The responsible person checks the difference and records the response to the crew.
Identify the source of the revision approved for site use
Use the project document register or the source where the team records revisions approved for use. Link the drawing code to the area, discipline, date and status. Keep the time at which the revision becomes applicable. A recently uploaded document could be under review or sent for comments. Check the register for the status that authorises site use.
In the site diary, record the observation date, area, crew, photo reference and drawing code the team says it consulted. If a number is visible in a photo, treat it as an observation to verify. An incomplete number, an object in the background or an obscured detail could refer to another drawing. Ask for the code from the document the crew actually used.
Compare the time of the observation with revision history
In this fictional case, drawing PL-M2-014 applies to area Z-M2. The register shows revision R05 approved for site use from 07:30. At 09:15, a field note says the crew consulted a copy marked R04, with photo P-003 attached. The same day also has R06 marked for review. The agent sends the area lead an issue citing R04 from the note and R05 from the register.
| Evidence | Sample value | Role in the issue |
|---|---|---|
| 09:15 field note | Drawing PL-M2-014, revision R04 | Revision the crew says it consulted |
| Document register | R05 approved from 07:30 | Applicable revision at the time of the observation |
| Recently uploaded file | R06 for review | Status shown for the area lead to consider |
| Photo | P-003, linked to area Z-M2 | Image the area lead can consult during the review |
Organise photos and keep their context
Keep original photos and record who attached them, the capture period and the area. The agent can transcribe notes or suggest labels, and a colleague validates the link to the location and drawing. When two crews use similar names for the same area, choose a stable code and show the aliases. Use that code in the diary, the register and the issue sent for review.
An issue can contain a concise description, the documents consulted and the question the responsible person needs to resolve. In a model-based BIM workflow, a format such as BCF can help share issues across applications. Keep the drawing code and revision in the project-approved register. The responsible person confirms whether the crew needs to consult a different document or clarify the note.
Test issue closure with fictional records
Test a valid revision, a superseded revision and a drawing without an unambiguous status. Check whether the issue explains the discrepancy, records the time and reaches the right person. A custom application with AI integration can connect the diary, photographs, revisions and decisions in one record. Close the issue once the responsible person has confirmed the situation and recorded their response.
Link the decision to the document version and evidence
The field form can keep separate fields for what a colleague observed, the document they say they used and what the responsible person confirms. For photo P-003, keep a reference to the original file and a description of what is visible. If the application marks up the image, save the markup as a separate annotation. The reviewer can compare the photograph with the note and drawing, then record the outcome in the issue after consulting the evidence.
Simulate a register outage when the 09:15 note comes in. The agent saves the note, time and attachment for review. The issue records when the register was last accessed. Once access returns, look up the revision status as it stood at the time of the observation, then check what applies now. If another revision has since taken effect, the reviewer can see both points in time and document what each means for the review.
At closure, the issue can record the date, the reviewer and the exact reference in the register. In one test, the reviewer records that the crew reported using R04, that the register showed R05 when the note was written and what response was given to the crew. Compare these fields with the history and check whether the issue remains readable once a new revision appears.
What if a revision was approved after the site note?
Compare the note with the revision applicable at the time of the observation and record the later change separately. The team can see both what applied then and which drawing is approved for the next stage.