An AI agent for comparing supplier quotes extracts prices, delivery terms and warranties and puts them on a common basis. The purchasing team can trace each value back to the original document. This guide uses three fictional quotes to show how a mandatory delivery deadline can change the order of preference.
- Common basis
Confirm the number of units, destination and acceptable lead time.
- Comparison
Calculate the total with freight and record warranty terms.
- Clarification
Show purchasing which details need confirmation before a decision.
Define the comparison before requesting quotes
State what you are buying, the quantity, unit, destination and required date. Decide whether to compare totals with or without VAT and use the same basis for every reply. In the example, you need 120 units within ten working days of order acceptance. Ask for net prices in RON, freight terms and the warranty that applies to the product.
Separate mandatory conditions from tie-break criteria at the start. For a consumable, delivery may be mandatory, while warranty can distinguish between otherwise comparable quotes. For a service, criteria could include covered hours and response time. Keep these conditions alongside the request sent to suppliers so reviewers can see the evaluation rule.
Keep the source for each value
Capture the supplier name, quote number, date, validity period and the page or line supporting each term. The agent can extract the quantity, unit price, currency and freight first, followed by lead time and warranty. Convert boxes or packs to units using the declared pack quantity. When a supplier writes that freight is to be agreed, ask for clarification and leave that value blank in the comparison.
Calculate the comparable total and check lead time
In the illustration, supplier A offers 120 units at RON 18 each plus RON 180 freight, with delivery in seven working days. Supplier B charges RON 19.20 per unit, includes freight and delivers in 14 working days. Supplier C quotes RON 18.50 per unit and offers six-day delivery, with freight still open. B has the lowest known total. A meets the deadline and has a complete cost, while C still needs clarification.
| Quote | Total net of VAT | Delivery | Review record |
|---|---|---|---|
| A | 120 × 18 + 180 = RON 2,340 | 7 working days | Meets deadline, freight known |
| B | 120 × 19.20 = RON 2,304 | 14 working days | Exceeds the ten-day limit |
| C | RON 2,220 plus unconfirmed freight | 6 working days | Confirm freight before ranking |
Record the warranty terms even when they do not change the order of preference in the exercise. For each supplier, note the duration, coverage and exclusions you find. If one supplier uses calendar days and another working days, keep their original wording and convert only once you have agreed the start date and calendar.
Recalculate when a supplier updates a quote
Send a precise clarification request, such as freight to the specified destination for 120 units. When the reply arrives, save the new version and note which field was updated. Calculate again using the same rules and show what changed. Retain the validity date of every quote, particularly when clarifications take time.
Try three additional cases before using the workflow. In the first, a supplier quotes in packs of 12. In the second, the quote is in another currency and the approved exchange rate is missing. In the third, an attachment changes the lead time. Ensure the operator can open the source of a value and confirm whether the new version supersedes the old quote.
Use the comparison for internal approval
Automation across purchasing applications can bring the request, quotes and clarifications into one comparison record. The appointed reviewer confirms the criteria and records the choice. Measure first-pass extraction accuracy and how often clarification changes a finding so you can improve the request template.
Show what each warranty covers before ranking
In a further case, two suppliers describe their warranties differently. One mentions replacement and the other a service visit within a stated time. The agent can record alongside duration what is covered, who receives a claim and where additional costs apply. If an annex contains those terms, retain the quote number, annex name and relevant field. The purchasing team decides whether the difference in coverage affects its evaluation.
Review replies tied to specific quantities as well. A price for 120 units may depend on a single delivery, while the company needs two batches. In the test, record this as a separate condition and confirm both the split and freight per delivery. Retain the original offer for history and recheck the deadline once the purchasing team receives confirmation.
When can you compare quotes by total cost?
Compare totals once you have confirmed the same quantity, price basis, applicable costs and delivery window. Until then, show which fields can be compared and which questions remain open.